by Steve Brouillard | Jun 30, 2015 | Offshore Fishing
Saturday June 27 2015 – After 45 days of working on the boat, it was finally time to take her out and do a little fishing! Share this:Click to share on Twitter (Opens in new window)Click to share on Facebook (Opens in new window)Click to share on Google+ (Opens...
by Steve Brouillard | Jun 27, 2015 | Grady White
The original bait tank on this vessel was not really designed to work with the more fragile fin baits that are used on the West Coast (i.e. anchovies). The new bait tank should handle these ‘fragile’ fin baits much better. The capacity is 75 gallons and up...
by Steve Brouillard | Jun 26, 2015 | Grady White
The pulpit was pretty beat up from years of use. It looked like the anchor had been dropped on it a couple of times as the fiberglass was shattered in several places and the existing gel coat was beat up. The pulpit was repaired with fiberglass and gel coat and looks...
by Steve Brouillard | Jun 24, 2015 | Grady White
The new rub rail is installed and gives the boat an instant facelift. The old rub rail served it’s purpose but it was definitely time to replace it. Getting to the corroded fuel sending unit is simple enough but the deck plate will need to be lifted in order to...
by Steve Brouillard | Jun 19, 2015 | Grady White
The new seats arrived with the new pedestals. The install was pretty simple but a little time consuming because I had to head out to West Marine and buy the correct size stainless steel bolts, nuts and washers. The new chairs give the cockpit a much better look. Share...